Similar Projects
Museum of Shenandoah Valley Trails
Post-Bid
Winchester, VA 22601

Main Street Enhancement Project
Post-Bid
$10,000 est. value
Orange, VA

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Parking and Drive Extension
Results
VA

West Great Neck Road Sidewalk
Post-Bid
Virginia Beach, VA

Pedestrian and Drainage Project
Results
$4,467,755 est. value
Fairfax, VA

Sidewalk Trip Hazard Removal
Term Contract
Post-Bid
Buchanan, VA 24066

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Driveway, Slope and Grade Repair-Culpeper
Post-Bid
Culpeper, VA 22701

State HQ Modernization Parking Lot Extension
Results
Richmond, VA 23297

Parking Area Upgrades
Post-Bid
Tasley, VA

Matthew Whaley Elementary School Parking Lot Improvements Project
Results
$472,304 est. value
Williamsburg, VA 23185

Z--Sidewalk Replacement
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Site Repairs and Improvements
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

FY 20 Concrete Sidewalk, Sidewalk Through Entrance, Curb, Curb and Gutter and Handicap Ramp Removal/Replacement
Post-Bid
Roanoke, VA 24011

Last Updated 04/01/2020 08:30 AM
Project Title

Inner Harbor Sidewalk

Physical Address View project details and contacts
City, State (County) Cape Charles, VA 23310   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install concrete sidewalk as follows: Base Bid - 1. Phase 1 - Approximately 65’ long and 7’ wide, in front of Harbormaster’s office. 2. Phase 2A - Approximately 157’ long and 10’ wide, northwest side of basin. 3. Phase 2B - Approximately 205’ long and 10’ wide, north side of basin. 4. Phase 2C - Approximately 187’ long and 10’ wide, northeast side of basin. Build around existing life boat installation as marked in field. Bid Alternate - 1.Phase 3 - Approximately 266’ long and 10’ wide, east side of basin.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents