Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Construct, Operate, and Maintain Broadband Network
Renovation
Sub-Bidding
$700,000 CJ est. value
Princeton, TX 75407

Street-Highway Lighting Maintenance
Term Contract
Sub-Bidding
$200,000 CJ est. value
Plano, TX 75074

Gas Turbine and Steam Turbine Field Service Maintenance
Term Contract
Post-Bid
$1,000,000 est. value
Denton, Nevada, TX 75173

Electrical Services District Wide
Term Contract
Post-Bid
Allen, Celina, Farmersville, Frisco, McKinney, Plano, Wylie, TX 75069

Apollo Pump Station 2020 Electrical and Mechanical Improvements
Alteration
Results
$3,837,000 est. value
Wylie, TX

Generators and Air Conditioning for Radio Tower Shelters
Alteration
Results
Blue Ridge, Celina, Copeville, McKinney, TX 75121

Bid Package 4- Electrical for the Wylie WTP IV Filter Complex Wall Repairs
Alteration
Post-Bid
$750,000 to $1,250,000 est. value
TX

Generator and ATS Replacement at Plano Campus
Alteration
Results
Plano, TX 75074

Electrical Maintenance Repair Services for Wichita Falls
Alteration
Post-Bid

Electrical Services for Special Events
Term Contract
Results
$60,000 est. value
Richardson, TX

Electrical Connection to Portable Building Abilene
Alteration
Post-Bid

Standby Generators for East Brown Pump Station, Newport Harbor Pump Station and Nortex Pump Station
Alteration
Results
$1,764,000 est. value
Wylie, TX 75098

Muddy Creek Lift Station Motor Replacement
Term Contract
Post-Bid
Wylie, TX

Acoustic Enhancement System
Alteration
Results
McKinney, TX

Last Updated 03/10/2023 04:10 PM
Project Title

Construction, Emergency Generator Fueling System Replacement

Physical Address View project details and contacts
City, State (County) McKinney, TX 75071   (Collin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $945,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All materials, labor, equipment and services to produce or be incorporated in such construction. Contract will be a general contract for removal of one underground storage tank and the installation of six above ground storage tanks (ASTs) for the storage of diesel fuel. Two of the four proposed diesel ASTs located adjacent to the housing clusters will be 2,500 gallons, and the other two will be 3,000 gallons. The two diesel ASTs adjacent to the Central Plant will both be 12,000 gallons. The existing generators and day tanks will remain as is, and the piping components connecting them together will be replaced as needed with schedule 40 carbon steel piping in the sizes indicated on the plan sheets. All Bidders must submit, prior to the bid opening time, a Certified Check, Cashier's Check or acceptable Bid Bond payable without recourse to Collin County in the amount of not less than five percent (5%) of the total bid plus alternates as submitted. Contractor must furnish performance, payment, and one (1) year maintenance bonds within ten (10) consecutive calendar days following award of contract. Funds for payment have been provided through the Collin County budget approved by the Commissioners Court for this fiscal year only. The Commissioners Court reserves the right to reject any and all bids.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents