Similar Projects
Natatorium and Gym
Renovation - 90,350 SF
Design
San Antonio, TX 78225

The Loren at Lady Bird Lake
New Construction
Design
Austin, TX 78704

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

Pool Resurface
Post-Bid
Palestine, TX 75801

Design-Build for a New Community Aquatic Center
Results
Bay City, TX

Oak Point Recreation Center Outdoor Pool
Results
$10,000,000 est. value
Plano, TX 75074

New Natatorium at Tomball Memorial High School
New Construction - 26,000 SF
Construction
Less than $10,250,000 est. value
Tomball, TX 77377

Temple High School Swim Center
New Construction, Demolition
Construction
Temple, TX 76504

Major League Cricket Stadium
Renovation
Pending Verification
Grand Prairie, TX 75050

Pool and Pool House Renovation
Renovation
Post-Bid
Bayou Vista, TX 77563

CMAR RRISD Aquatic Practice Facility
Results
Less than $12,000,000 est. value
Round Rock, TX 78681

Stadium Improvement Project
Construction
Less than $2,500,000 est. value
Ingleside, TX 78362

Swimming Pool Replastering
Post-Bid
Terrell, TX 75160

Pool Maintenance and Repairs Blanket Contract
Results
Less than $10,000 est. value
Austin, TX 78751

Summerlyn West Amenity Center
New Construction
Construction
Liberty Hill, TX 78642

Last Updated 11/30/2020 04:18 PM
Project Title

Renovations of Mercer Complex and Don Cook Natatorium

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77479   (Fort Bend County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,838,445
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to the following: Wheeler Fieldhouse – Renovations to concessions, restrooms and dressing rooms; new accessible seating; HVAC unit replacement; room signage and wayfinding. Don Cook Natatorium - Renovations to mechanical & pool equipment room; fire sprinkler system replacement; plumbing fixture replacement; new covered equipment enclosure. Mercer Stadium - New paving and accessible paths from parking lot to field; storm drain modifications; renovations to concessions/ticket booth/restroom buildings; new elevator tower and accessible restroom at press box; new accessible seating; repairs to brick masonry veneer and galvanized guardrails.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents