Similar Projects
248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Wayfair Fulfillment Center - Airport Logistics Center 2 / Romeoville
New Construction, Infrastructure - 1,200,000 SF
Design
$129,600,000 CJ est. value
Plainfield, IL 60544

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

Laraway Road Water Tower Reconditioning 2022
Infrastructure
Results
$1,765,712 est. value
Joliet, IL

2022 Asphalt Maintenance
Infrastructure
Results
Joliet, Plainfield, IL 60585

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

87th St. Bridge Over Springbrook Creek - BR019 - City Of Naperville
New Construction, Infrastructure
Conception
$1,734,000 CJ est. value
Naperville, IL 60564

Willow Tree Farm Subdivision / Plainfield
New Construction, Infrastructure - 21,759 SF
Design
$42,652,136 CJ est. value
Plainfield, IL 60544

House of Harvest
New Construction, Infrastructure - 3,500 SF
Post-Bid
$934,500 CJ est. value
Plainfield, IL 60544

Curb Ramps for Sidewalks ADA Improvement
Infrastructure
Results
$900,000 est. value
Joliet, IL

Arbys at Romeoville Crossing
New Construction, Infrastructure
Pending Verification
$700,000 CJ est. value
Romeoville, IL 60446

Last Updated 10/16/2023 09:33 AM
Project Title

Parking Lot and Drainage Improvement

Physical Address View project details and contacts
City, State (County) Channahon, IL 60410   (Will County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Parking lot and drainage improvement. Full-depth removal and replacement of existing pavement. Location: 1-55 Maintenance Yard, Bolingbrook. Region : 1 District : 1 Federal Project # N/A County(s) : Will Key Route(s) : FAU 3510 Marked Route(s) : EAST FRONTAGE ROAD Section(s) : 2018-121-RS State Job #(s) : C-91-273-19 PPS #(s) : 1-80330-0000 Completion Date: 25 Working Days Questions not accepted as of November 07, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 27, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IDOT - 021 - Parking Lot and Drainage Improvement

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents