Similar Projects
Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

BBP - Rr O pass to Yellowstone R
Infrastructure
Bidding
$800,000 CJ est. value
Helena, MT 59601

BBP - Rr O pass to Yellowstone R
Infrastructure
Bidding
$800,000 CJ est. value
Helena, MT 59601

Snow Plowing And Removal Services
Term Contract
Post-Bid
Helena, MT

Snow And Ice Ada Ramp Removal Services
Term Contract
Post-Bid
Helena, MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Hudson Bay Divide South
Infrastructure
Results

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

Plug and Reclaim 14 Orphaned Wells - Plentywood Group
Infrastructure
Bidding
$300,000 CJ est. value
Helena, MT 59601

Snow Removal Services
Term Contract
Post-Bid
Helena, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

East of East Helena - East Nh 8-2(99)53
Infrastructure
Results

Last Updated 09/21/2022 05:04 AM
Project Title

Benton Avenue Intersections

Physical Address View project details and contacts
City, State (County) Helena, MT 59601   (Lewis and Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of reconstructing the City Solid Waste Transfer Station approach and entrance at Benton Avenue and installation of left-turn lanes into the Sunhaven Subdivision and Bill Roberts Golf Course (Cole Avenue). The work for the turn lanes north of the MRL railroad crossing generally includes street widening and construction of curb and gutter along Benton Avenue, reconstruction of adjacent approaches and pedestrian curb ramps, construction of sidw2aks and curb ramps, and grading roadside drainage swales. Site Directions: Benton Avenue Transfer Station Intersection and Benton Avenue between railroad track and Custer Avenue

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents