Similar Projects
East Dining Hall Upgrades
Renovation
Conception
Canyon, TX 79016

Shipley Do-Nuts
New Construction - 22,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Prosper, TX

Jersey Mike's
Renovation - 1,200 SF
Design
$200,000 est. value
Rosenberg, TX 77469

Braum's Ice Cream & Dairy Store
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Abilene, TX 79601

Starbucks
New Construction - 2,016 SF
Bidding
$500,000 est. value
Prairie View, TX 77445

Lewisville Lake Project
Post-Bid
Lewisville, TX

Starbucks
New Construction - 2,255 SF
Post-Bid
$800,000 est. value
Houston, TX 77002

Wendy's
Renovation - 2,774 SF
Construction
$200,000 est. value
Kingwood, TX 77339

151 Coffee
New Construction - 500 SF
Construction
$200,000 est. value
Lewisville, TX 75067

Walk On's Sports Bistreaux
New Construction
Pending Verification
$3,200,000 est. value
Lubbock, TX

Walk On's Sports Bistreaux
New Construction
Pending Verification
$3,200,000 est. value
Lubbock, TX

Shipley Do-Nuts
New Construction - 2,200 SF
Conception
$500,000 to $1,000,000 CJ est. value
Roanoke, TX

Northline
New Construction - 1,150,000 SF
Design
$10,000,000 CJ est. value
Leander, TX 78641

Domino's #8796
Renovation - 1,300 SF
Post-Bid
$260,000 est. value
Dickinson, TX 77539

The Human Bean Coffee
New Construction - 752 SF
Construction
$300,000 est. value
Lewisville, TX 75067

Reported 07/07/2022 10:08 AM
Project Title

Dutch Bros Coffee - Tx1804 / Terrell

Physical Address View project details and contacts
City, State (County) Terrell, TX 75160   (Kaufman County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected September 2022, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 6, 2022, this project is under review with the City of Terrell. An architect has been selected. Information on the general contractor and method of selection ha not been released yet. While a firm construction timeline has not been established, construction is anticipated to begin in Sept. 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents