Similar Projects
2021 HMAC Hot In-Place Recycling
Infrastructure
Post-Bid
Longview, TX

2022 Chip Seal
Infrastructure
Post-Bid
$1,200,000 est. value
Longview, TX

Joe Burl Lane Pavement Rehabilitation
Results
Lakeport, TX 75603

Loop 281 and Nealy Way Intersection Improvements
Results
$403,930 est. value
Longview, TX

2021 Chip Seal
Results
Less than $1,300,000 est. value
Longview, TX

Hot Mix
Results
$276,000 est. value
TX

2020 Seal Coat Program
Results
Longview, TX 75603

2021 Group Seal Coat Program
Results

Fairmont Street Reconstruction Project
Results
$4,739,233 est. value
Longview, TX 75608

US 259 - Seal Coat
Results
$1,820,471 est. value
TX

2021 Street Overlay
Infrastructure
Results
$175,000 est. value
Longview, TX

High Street and Mobberly Avenue Intersection Improvements
Infrastructure
Results
$2,850,000 est. value
Longview, TX 75602

Street Improvements, Phase 2
Infrastructure
Results
$85,000 to $95,000 est. value
Lakeport, TX 75603

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

2021 CDBG Water, Sewer, Drainage, and Street Improvements - Joaquin Court
Infrastructure
Results
$224,000 est. value
Longview, TX 75604

Last Updated 05/30/2022 03:12 AM
Project Title

Hazard Elimination and Safety

Physical Address View project details and contacts
City, State (County) TX   (Gregg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $104,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 5.500 1 500 6001 Mobilization Ls 1.000 2 502 6001 Barricades, Signs and Traffic Handling Mo 1.000 3 644 6001 in Sm Rd Sn Sup&am Ty10bwg(1)sa(P) Ea 25.000 4 644 6076 Remove Sm Rd Sn Sup&am Ea 6.000 5 6001 6001 Portable Changeable Message Sign Day 14.000 6 6185 6002 Tma (Stationary) Day 15.000 7 6350 6001 Lead Led Chevron Ea 6.000 8 6350 6002 Led Chevron Ea 32.000 9

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents