Similar Projects
Sewer Outfall Line Replacement
Infrastructure
Bidding
$50,000 CJ est. value
Thomasville, GA 31792

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Storm Drainage and Street Improvements to Serve the Barnes Street, Horn Street, North Main Street and Ruby Street Area
Infrastructure
Post-Bid
Boston, GA 31626

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

2022 Landfill East End Road Resurfacing
Infrastructure
Post-Bid
$200,000 est. value
Thomasville, GA 31757

Resurfacing - Bulloch Road
Results
$3,327,865 est. value
Thomasville, GA 31757

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

T32-D4-Bridge-SR 37 and SR 38-124987
New Construction
Results

2021 Community Development Block
Infrastructure
Post-Bid
$300,000 est. value
Thomasville, GA

T32-D4-Bridge-Various locations-124988
New Construction, Infrastructure
Results

2022 City Bridge Repairs
Infrastructure
Post-Bid
$800,000 CJ est. value
Thomasville, GA 31792

Resurfacing
Infrastructure
Results
$3,734,682 est. value
Metcalf, Ochlocknee, Thomasville, GA 31792

Patching and Underdrain Installations on 3 Streets
Infrastructure
Results
$300,000 est. value
Thomasville, GA

Last Updated 07/26/2022 10:07 AM
Project Title

Construction of City Bridge Improvements

Physical Address View project details and contacts
City, State (County) Thomasville, GA 31792   (Thomas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

ids must be accompanied by a Certified Check or Bid Bond in the amount of not less than ten (10) percent of the Bid, as a guarantee that the Bidder, if awarded the Contract, will within ten (10) days after written notice having been given of such award, enter into a written contract with the City of Thomasville, Georgia, in accordance with the accepted proposal. Bids must be sealed and plainly marked "CITY BRIDGE IMPROVEMENTS" and must be delivered before the time specified. The bidder shall complete, execute and submit the following documents from these contract documents: Section 00410 - Bid Form, Section 00430 - Bid Bond, Section 00450 - Statement of Bidder's Qualifications, Section 00451 - Contractor's Oath and Non-collusion Affidavit of Subcontractor. Bidders are required to review the insurance requirement stated in Section 00730 - Supplementary Conditions of the contract specifications with their provider to insure all aspects of the requirements can be met. No Bids may be withdrawn after the scheduled closing time for the request of bids for a period of sixty (60) days Separate Payment and Performance Bond in the amount of one hundred percent (100%) of the Contract will be required. All bid bonds, performance and payment bonds, insurance contracts and certificates of insurance shall be either executed by or counter-signed by a licensed resident agent of the surety or insurance company, having his/her place of business in the State of Georgia, and in all ways complying with the insurance laws of the State of Georgia. The City of Thomasville, Georgia, reserves the right to reject any and all bids, to waive informalities, to re-advertise, and/or to award the contract in the best interest of the City. The deadline for receipt of deposit (City Engineer Office) for plans and specifications to assure delivery is 3:00 PM, July 19, 2022. If there are any questions please email, Cheryl.glass@thomasville.org Provide all labor and equipment for the following: (1) Rip rap installations along the Chatham Drive bridge (over Bruce's Branch), Martin Luther King Drive bridge (over Mill Creek), Old Cassidy culverts (over Bruce's Branch). (2) Concrete bridge deck and pile spall repairs for Martin Luther King Jr. Drive bridge (over CSX railroad). (3) Expansion joint cleaning and replacements at both Martin Luther King Jr. Drive bridge (over CSX Railroad) and Chatham Drive bridge (over Bruce's Branch). All construction shall comply with the 2021 GDOT Specifications. All work shall be completed within forty five (45) consecutive calendar days following receipt ofthe notice to proceed

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents