Similar Projects
Countywide Public Safety Roof Replacements at Department of Corrections – Phase III Multiple Buildings
Bidding
IL

Roof Replacements Phase III
Bidding
Chicago, IL

Roofing Envelope Services
Post-Bid

Roofing Envelope Services
Post-Bid

Multiple Roof Replacement
Renovation
Results
Rantoul, IL 61866

Replace Roofing Systems
Results
$750,000 to $900,000 est. value
Park Forest, IL 60466

Reroofing & Tuckpointing
Construction
Oak Park, IL 60302

Roof Repair/Replacement
Bidding
Mount Sterling, IL

Roof Replacement
Renovation
Post-Bid
Park Forest, IL 60466

NEIU Replace Campus Roofs
Results
Less than $4,000,000 est. value
Chicago, IL 60625

Masonry Restoration and Roofing Improvements
Bidding
Broadview, Maywood, Melrose Park, IL 60160

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Roof Repair and Replacement
Results
$35,000 est. value
Indian Head Park, IL 60525

County Highway Maintenance Facility and ILEAS Roof Replacement
Bidding
Urbana, IL 61802

2021 Roof Replacement at Arbor Park MS
Post-Bid
Oak Park, Tinley Park, IL 60477

Last Updated 04/22/2021 09:47 AM
Project Title

Replace Roofing System

Physical Address View project details and contacts
City, State (County) Sycamore, IL 60178   (DeKalb County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete.
Division 05 - Metals, Structural Steel Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Maintenance of Finishes, Maintenance of Painting and Coating, Repainting, Painting, Exterior Painting.
Division 22 - Plumbing, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Storm Drainage Piping Specialties.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment.
Division 26 - Electrical, Operation and Maintenance of Electrical Systems, Maintenance Testing of Electrical Systems, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents