Similar Projects
High Expansion Foam Install with Pumphouse
New Construction
Design
$1,000,000 to $5,000,000 est. value
Middle River, MD

MCC Replacement – Green Branch Wastewater and Mill Branch Wastewater Pump Station
Bidding
Laurel, MD

Heritage Harbor 2 Sewage Pumping Station
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Martingham Distribution Pump Replacement
Renovation
Post-Bid
Saint Michaels, MD 21663

Stony Run Wastewater Pumping Station Upgrade
Results
$2,500,000 to $5,000,000 est. value
Baltimore, MD

Cedar Lane Water Pumping Station
Results
$2,500,000 to $5,000,000 est. value
MD

Heritage Harbor 2 Sewage Pumping Station Upgrades
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Colgate Stormwater Pumping Station Upgrade
Results
$2,000,000 to $3,000,000 est. value
Baltimore, MD

Construction of Newark Spray Irrigation Facilities
Results
Snow Hill, MD 21863

Smouses Mill Pumping Station Upgrades
Results
$125,000 est. value
Cumberland, MD 21502

Refurbishment of Little Anacostia Wastewater Pumping Station
Renovation
Results
$5,000,000 to $7,000,000 est. value
Capitol Heights, MD 20781

Daniels Area Wastewater Pump Station
Results
Less than $1,505,000 est. value
Columbia, MD 21046

Hyde Park Pumping Station Improvements—Consent Decree
Results
$2,500,001 to $5,000,000 est. value
Hydes, MD 21221

Cockeysville Pumping Station Improvements
Renovation
Results
$5,000,001 to $10,000,000 est. value
Cockeysville, MD 21030

Bar Harbor I and II SPS Upgrades
Renovation
Results
Less than $3,230,880 est. value
Pasadena, MD 21122

Reported 10/10/2020 12:00 AM
Project Title

Underground Storage Tank Conversion

Physical Address View project details and contacts
City, State (County) Ashton, Brentwood, Silver Spring, MD 20707 (Montgomery, Prince Georges Counties)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove, decommission, and haul off-site an existing 1,000 gallon fiberglass reinforced plastic double-walled underground storage tank (UST), associated electrical and mechanical devices, and all other existing related equipment and materials. 2. Replace existing UST with a new 1,000 gallon above ground storage tank (AST) 3. Replace existing Day Tank with a new 25 gallon Day Tank equipped with a duplex pump system (Supply and Return pumps). 4. Construct a new reinforced concrete pad with bollards surrounding perimeters vulnerable to vehicular and equipment traffic. 5. Provide a Tank Monitoring System (TMS) and all related electrical and mechanical devices.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents