Similar Projects
2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Seal Coat
Infrastructure
Post-Bid
Morris, IL

Apply Emulsified Asphalt Seal Coat and Remark Runway 18-36
Results
Morris, IL

Valerio Road and Carbon Hill Road Fog Seal Coating
Results
Coal City, IL

HMA
Infrastructure
Post-Bid
Morris, IL

Perform Crack Filling Fiber Asphalt Operations on Various County
Results
Less than $140,070 est. value
IL

Crack Fill
Infrastructure
Post-Bid
Morris, IL

Supply - Haul and Spread Stone in Various Operations for Road
Results
Less than $78,875 est. value
IL

Cape Seal
Infrastructure
Post-Bid
Morris, IL

Perform A-1 Resurfacing and Cape Seal Operations
Results
Less than $309,379 est. value
IL

0.7 MI of Mcclindon Rd in Channahon to 0.2 Mi W of Will Co Line
Infrastructure
Post-Bid
IL

Hot-Mix Asphalt Operations on Various Township Roads
Results
Less than $648,666 est. value
IL

HMA Surface Removal
Infrastructure
Post-Bid
$200,000 est. value
Gardner, IL

Intersection Reconstruction (Channelization, Widening, Traffic Signal Modernization, Drainage Improvements)
Results
Braidwood, Coal City, Wilmington, IL

Minooka PCC Pavement Patching and Crack Sealing on Twin Rail Drive
Infrastructure
Post-Bid
$368,000 est. value
Minooka, IL 60447

Reported 06/24/2022 12:00 AM
Project Title

Perform Various Operations on Brisbin Road

Physical Address View project details and contacts
City, State (County) Morris, IL   (Grundy County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Perform Various Operations on Brisbin Road From Sherrill Road Intersection to North of Interstate 80. Major Material Quantities Include: Earth Excavation: 5,924.00 Cu. Yds Processing Modified Soil 12" - 16,599 Sq Yds Aggregate Subgrade Improvement 12" - 2,972 Sq Yd Longitudinal Joint Sealant - 12,482 Feet Hot-mix Asphalt Binder Course, Il-19.0, N50 - 5,436 Tons Hot-mix Asphalt Surface Course, Il-9.5, Mix "C", N50 - 2,753 Tons Aggregate Shoulders, Type B 8" - 9,341 Sq Yds Thermoplastic Pavement Marking - Line 4" - 36,092 Feet Stabilized Depth Reclamation - 13,354 Sq Yds. Project Location: North of Interstate 80 to the Intersection of Sherrill Road

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents