Similar Projects
Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Southern Region Disaster Recovery Support BPA
Results

2019 Bond Program Streets South of I-10 Phase 2
Results
Less than $195,544 est. value
Orange, TX 77630

Eagle Point Parkway and Medical Center Drive
Results
$1,500,000 est. value
Orange, TX 77630

Intersection Improvement Highway :FM1006
Results
$597,313 est. value
TX

2021 Group Seal Coat Program
Results

Eagle Point Parkway and Medical Center Drive - Phase 1
Infrastructure
Results
$1,440,669 est. value
Orange, TX

FM1006-Flexible Pavement Structure Repair
Infrastructure
Results
$1,157,596 est. value
TX

SH 87-Surfacing/Roadway Restoration
Infrastructure
Results
$2,535,803 est. value
TX

Construction of the LCM Middle School Back Drive HMAC Rehabilitation
Infrastructure
Results
Orange, TX 77632

Street Repairs for Gary Street, Franklin Street and Professional Drive
Infrastructure
Results
$161,135 est. value
Bridge City, TX 77611

FM 1442 - Construct New Road
Infrastructure
Results
$5,807,459 est. value
TX

Northway Track and Crossing Improvements
Infrastructure
Results
$277,816 est. value
Orange, TX

High School Driveway Rehabilitation
Alteration
Results
Orange, TX 77632

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Reported 03/30/2022 12:00 AM
Project Title

2022 Street and Parking Lot Construction

Physical Address View project details and contacts
City, State (County) Orange, TX   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all labor, materials, equipment, and performing all work required to replace/resurface approximately 4,199 SF of exiting roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents