Similar Projects
The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

Central Street Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Central Falls, RI 02863

Hidden Meadows
New Construction
Design
Cumberland, RI

Community Music Works
New Construction, Infrastructure - 11,033 SF
Design
$5,000,000 CJ est. value
Providence, RI 02909

RFP D/B - Dorrance Street Transit Center Joint Development P3
Infrastructure
Bidding
$3,000,000 CJ est. value
Providence, RI 02903

Expand and Renovate Space for New MRI
Addition, Demolition, Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
N Providence, RI 02908

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

AutoZone #5132 / Cranston
New Construction, Infrastructure - 35,000 SF
Post-Bid
$1,500,000 CJ est. value
Cranston, RI 02920

Meadowbrook Drive Water Main Replacement
Alteration
Results
Cumberland, RI 02864

Lead Services Line Replacement Program 2021-2022
Term Contract, Infrastructure
Results
Providence, RI

Matteo Estates
New Construction
Construction
Smithfield, RI 02917

Mavis Street / Townhomes
New Construction, Infrastructure
Construction
$4,020,000 CJ est. value
Pawtucket, RI 02860

The Preserve at Pippin Orchard
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cranston, RI 02921

The Preserve at Pippin Orchard
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cranston, RI 02921

Douglas Pike Water Main Installation - 23-Wtr-05 - Town Of Smithfield
Alteration
Conception
$2,000,000 est. value
Smithfield, RI 02917

Last Updated 03/31/2023 04:03 PM
Project Title

Briarwood Estates / Cranston

Physical Address View project details and contacts
City, State (County) Cranston, RI 02910   (Providence County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Single-Family Homes, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 12 single family homes. As of March 31, 2023, this project is in the early planning stages, and received master plan approval from the City of Cranston. the project is subject to a final plan review. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to fall 2023.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents