Similar Projects
Filter Replacement and Maintenance of Air Handling Units
Alteration
Bidding
Tucson, AZ

Walk-In Cooler and Freezer
Alteration
Bidding
Yuma, AZ

J043--644 - Annual Chiller, Condensers, & Evaporator Testing
Post-Bid
Phoenix, AZ 85012

HVAC System Coil and Air Handler Cleaning
Term Contract
Post-Bid
Phoenix, AZ 85003

Franklin at Brimhall Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85206

Shepherd Junior High Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85205

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

HVAC Parts and Accessories
Alteration
Bidding
Less than $250,000 est. value
Scottsdale, AZ

Chemical Water Treatment
Post-Bid
Luke Air Force Base, AZ 85309

Robson Elementary Cooling Tower Repairs
Results
Mesa, AZ 85204

Globe JHS - Mofford Center HVAC Replacement Project
Alteration
Bidding
Globe, AZ 85501

Utterback Middle School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85713

Smith Junior High Cooling Tower Repairs
Results
Mesa, AZ

House and Senate Capitol Projects - CMAR
Renovation, Term Contract
Bidding
$6,500,000 est. value
Phoenix, AZ 85007

HVAC Services
Term Contract
Post-Bid
Window Rock, AZ

Last Updated 12/01/2021 02:35 PM
Project Title

Remove and Replace Existing R-22 Freon Using Air Condition (AC) Units

Physical Address View project details and contacts
City, State (County) Florence, AZ 85132   (Pinal County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace Jail Units - (4ea) 7.5-ton, (2ea) 4-ton, and (2ea) 5-ton package gas electric units and adapter curbs. Remove and replace Pod Units A,B,C,D,E – (10ea) 7.5-ton package gas electric 2 stage high efficiency units and adapter curbs. The Jail units 3 & 4 need to be re-configured to avoid intake and discharge of air into each other. Relocate and replace the jail POD disconnects to the outside of the surrounding wall and replace all other disconnects. Remove and replace 28 AC units and air handling units . The units range from 3-12.5 ton, an inventory list will be provided upon request. Crane up new units with new adapter curbs for all roof mounted units. Verify ground units accessibility and provide quotes accordingly. Install new A/C whips to each unit. Install new gas flex to each unit where applicable. Check conduit for good condition and reuse. Replace if necessary. Install energy management controllers with discharge air sensors, fan/compressor stats, tie into existing system to Building Management Systems, install Wi-Fi routers and hard wire units on roof with new space temp stainless steel plates. The existing BMS is Niagra by Tritium Bacnet to interface. The final integration of this system must be coordinated by onsite ICE staff and local servicing contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents