Similar Projects
Last Updated | 10/13/2022 05:33 PM |
Project Title | RFP D/B - US 301 Over Four Hole Swamp Design-Build Project |
Physical Address | View project details and contacts |
City, State (County) | Cameron, SC 29030 (Calhoun County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Design-Build Firm to Subcontract, Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $19,340,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SCDOT proposes to replace the existing load restricted southbound bridge as well as the northbound bridge and related roadway approaches along US 301 over Four Hole Swamp in Orangeburg County. The project will also include additional traffic safety countermeasures including 4' inside and 6' outside paved shoulders and resurfacing from MM 27.8 to MP 29.2. The purpose of this Request for Proposals (RFP) is to select a Proposer to perform the Project services and to design and construct the Project, as further described in this RFP. SCDOT desires that this Project be designed and constructed in a very efficient and timely manner For this Project, SCDOT chose the two-phased selection method. Phase 1, which identified a short-list of qualified Proposers, is complete. In Phase 2, SCDOT invites each of the short-listed Proposers to submit their Proposals for completion of the Project. After evaluation of the Proposals, SCDOT plans to award and execute the Contract with a single Contractor. A general overview of Phase 2 includes, but is not limited to, the following steps: SCDOT releases RFP for Industry Review SCDOT holds Open-Forum Meeting with Proposers to clarify/revise RFP SCDOT releases Final RFP Proposers submit Formal ATCs and Confidential Questions SCDOT conducts Confidential One-on-One Meetings with Proposers to discuss Formal ATCs and Confidential Questions, if necessary accepts Non-confidential Questions and conducts Open-Forum Meetings with all Proposers, if necessary SCDOT approves/disapproves Formal ATCs Proposers submit Proposals SCDOT evaluates Proposals SCDOT conducts Bid Opening, recommends , and selects a Contractor |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |