Similar Projects
CJ Food Production Warehouse
New Construction - 700,000 SF
Conception
$500,000,000 est. value
Sioux Falls, SD 57107

Wholestone Farms Pork Processing Plant
New Construction
Conception
$500,000,000 est. value
Sioux Falls, SD 57104

Remove and Replace PCC Surfacing Replace Str, Grading
Infrastructure
Design
$34,171,000 est. value
Humboldt, SD 57035

Basin 21 Sanitary Sewer Improvements
Infrastructure
Bidding
$760,000 CJ est. value
Sioux Falls, SD 57104

Harrisburg Schools 3rd Addition Mass Grading - South Cliff Avenue and East 85th Street
Infrastructure
Post-Bid
Sioux Falls, SD 57109

Sioux Falls Veterans Community Project
Infrastructure
Post-Bid
$1,000,000 est. value
Sioux Falls, SD 57104

Harrisburg Schools 4th Addition Mass Grading
Infrastructure
Results
Sioux Falls, SD 57109

Lennox 4-H Site Grading Improvements
Infrastructure
Results
$125,000 est. value
SD

Henkel Facility Expansion
Addition
Pending Verification
$30,000,000 est. value
Brandon, SD

Grading, Storm Sewer, Curb and Gutter, PCC Surfacing, Str Widening, Signals, Lighting
Infrastructure
Conception
$21,659,000 est. value
Sioux Falls, SD 57106

Pavement Marking - Sioux Falls Area
Infrastructure
Post-Bid
$883,000 CJ est. value
Mitchell, SD 57301

Brandon Core Area Reconstruction Phase 2
Infrastructure, Alteration
Results
Brandon, SD

Modify Crossovers
Alteration
Conception
$4,481,000 est. value
Sioux Falls, SD 57109

Foundation Park North Mass Grading
Infrastructure
Results
Sioux Falls, SD

Construction of Airport Improvements on Sioux Falls Regional Airport
Infrastructure
Results
$401,000 est. value
Sioux Falls, SD 57104

Last Updated 07/21/2022 03:05 PM
Project Title

WholeStone Farms Pork Harvesting And Processing Facility

Physical Address View project details and contacts
City, State (County) Sioux Falls, SD 57104   (Minnehaha County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a pork harvesting and processing facility. Exact scope, including square footage, has not been released. As of July 21, 2022, this project is in the permitting phase. Both an architect and a general contractor have been selected though the company names have not been released. Construction is estimated to begin around New Year's 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents