Similar Projects
Cornucopia - Port Wing Construction / Culvert Replacement
Infrastructure
Conception
$2,000,000 CJ est. value
Ashland, WI 54806

Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Timeless Timber Site Residential Redevelopment
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Ashland, WI 54806

New Water GBF North Plant Clarifier Rehabilitation Project
Renovation, Infrastructure
Bidding
$38,500,000 CJ est. value
Green Bay, WI 54302

Cultural Center
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Bayfield, WI 54814

New Aquatic Center - City of Rice Lake
New Construction, Infrastructure
Sub-Bidding
$7,500,000 CJ est. value
Rice Lake, WI 54868

Pond and Drainage System Construction
Infrastructure
Post-Bid
$270,923 CJ est. value
De Pere, WI 54115

De Pere High School - Tennis Court Site Development
Infrastructure
Post-Bid
De Pere, WI 54115

Water Tower Rehabilitation
Infrastructure
Results
Haugen, WI

Alley Reconstruction
Infrastructure
Results
$663,465 CJ est. value
De Pere, WI 54115

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Total Service Development Building Addition
Addition, New Construction, Infrastructure - 2,450 SF
Pending Verification
$525,000 CJ est. value
Howard, WI 54303

Last Updated 05/10/2023 12:36 PM
Project Title

Village of Birchwood - Corrosion Control Improvements

Physical Address View project details and contacts
City, State (County) Birchwood, WI 54817   (Washburn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $127,670 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Provide and install chemical feed equipment, storage and containment tank for addition of caustic soda, chemical feed injectors, digital chemical scales for caustic soda and sodium hypochlorite, chemical storage and containment tank for sodium hypochlorite, safety equipment, and well discharge pipe modifications. Work also includes the following electrical construction: replace existing programmable logic controller with new PLC, and associated power distribution equipment and circuitry. Bid will include an additive alternative to provide and install a new magnetic flow meter and associated electrical work. The bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at website. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at website. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village Of Birchwood.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents