Similar Projects
General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

Medical Science Building Courtyard Storm Water Drainage & Landscape
Infrastructure
Design
Columbia, MO

Thermoplastic Pipe 2022
Term Contract
Bidding
MO

Reinforced Concrete Pipe 2022
Term Contract
Bidding
MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
MO

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Euclid 4130 and 4136 Bioretention CSO VR GI
Results
$250,000 est. value
Saint Louis, MO

Minnie Ave to Greenhaven Storm Sewer Separation
Results
$183,000 est. value
Flordell Hills, Jennings, MO

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Mowing I - St. Louis County
Infrastructure
Bidding
MO

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Elson Street Culvert Replacement
Results
Kirksville, MO

Mowing E - City of St. Louis
Infrastructure
Bidding
MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Reported 01/31/2022 08:36 AM
Project Title

Green Infrastructure

Physical Address View project details and contacts
City, State (County) Kansas City, MO   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Landscaping, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Green Stormwater Infrastructure (GSI) included in this project generally consists of stormwater inlets (curb cuts, water quality inlets), energy dissipation (inlet sediment forebays, rock erosion blankets), depressed surface storage (bioretention swales contained within modified curbs, subdrains), GSI Landscaping (plantings specified as a functional component of the GSI system), subsurface storage (below-grade storage pipes with cleanouts), flow control elements (weirs, riser inlet structures, water control structures, outlet control structures, check valves), and distribution piping (storm sewers).

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents