Similar Projects
Canyon Road Sidewalk - 4380 North To Foothill Drive - City Of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT

600 South Sidewalk - 1100 West To 1600 West - City Of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT

On-Call Task Order Soft-Surface Trail System Maintenance and Related Services
Term Contract
Bidding
$177,256 est. value
Cedar City, UT

2022 - 2024 Trails Projects Prequalification
Term Contract
Bidding
Bountiful, UT

Parking Lot G and F Rail Trail Connections Project 2021
Post-Bid
Park City, UT

Panguitch High School South Parking Lot Improvement Package
Post-Bid
Panguitch, UT 84759

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

2020 Green River City Curb and Gutter and Sidewalk Project
Results
Green River, UT

Canyon Road Sidewalk - 3450 North to 3540 North - City of Provo
Infrastructure
Conception
$250,000 est. value
Provo, UT 84603

1300 West Street Realingment Project
Infrastructure
Bidding
$400,000 est. value
Pleasant Grove, UT 84062

300 East - 3900 South to 3970 South
Post-Bid
Millcreek, UT

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Sidewalk Trip Hazard Saw Cutting
Infrastructure
Bidding
Salt Lake City, UT

BRHS Natatorium Parking Lot Expansion
Post-Bid
Brigham City, Garland, Tremonton, UT 84312

Payson Forebay Parking Lot
Results
$199,420 est. value
Payson, UT 84651

Last Updated 06/24/2022 10:39 AM
Project Title

River Heights City Park Project - Phase 1

Physical Address View project details and contacts
City, State (County) River Heights, UT 84321   (Cache County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Generally includes the installation and construction of two paved parking areas (west and east) connecting to the existing Stewart Hill Drive and constructing a 10-foot-wide concrete sidewalk through the park. Installing water service for the future restroom, landscape irrigation, and yard hydrant at future picnic shelter. The project also includes connecting sewer service for the future restroom, and connecting electrical service for future amenities.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents