Similar Projects
US0082 - Hot Mix
Infrastructure
Bidding
$279,000 est. value
TX

Street and Drainage Improvements
Post-Bid
Megargel, TX

Donna, Melinda, and Mirabeau Street Improvements
Post-Bid
$1,530,000 est. value
Tyler, TX 75702

Asphalt Rejuvenator
Results
Less than $600,000 est. value
San Antonio, TX 78207

Paving W & SS Replacement 2018 CIP YR 2 Contract 18
Results
$9,195,815 est. value
Fort Worth, TX 76102

Seal Coat
Post-Bid
TX

2020 Pavement Rehabilitation
Results
Clarksville, TX 75426

New Parking Lot at City Hall
Post-Bid
$380,000 to $415,000 est. value
Nolanville, TX 76559

Transportation Safety and Mobility Improvements IDIQ
Results
Less than $3,000,000 est. value
Austin, TX 78704

Annual Asphalt Street Repair 2020-2021
Infrastructure
Post-Bid
Heath, TX

Eisenhauer Road/Northwood-Devonshire Drive Area Phase I
Results
Less than $4,113,403 est. value
San Antonio, TX 78205

Bryson Phase 14, Public Improvement Construction Plans
Infrastructure
Post-Bid
Leander, TX

Yankee Creek and Myers Road Improvements
Results
$600,000 est. value
Heath, TX 75032

2022 Asphalt Crack Seal Project
Infrastructure
Post-Bid
Tyler, TX

2020 CDBG Hanover Drive and Vanderbilt Drive Rebuild
Results
$3,000,000 est. value
Arlington, TX 76010

Last Updated 01/13/2022 08:31 AM
Project Title

Kelcy Way Road Improvement

Physical Address View project details and contacts
City, State (County) Early, TX   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $882,517
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The sequence of construction for the roadway improvements is as follows: 1. Set signage and barricades as shown in the Traffic Control Layouts. 2. Contact Texas811 to mark utility locations. Additionally, contact City of Early to locate possible additional features prior to construction. 3. Install SWPPP devices according to plan. 4. Perform work according to plan including construction of sidewalks, drainage features, and associated parking upgrades. 5. Clean project site including finished pavement surface and remove SWPPP devices.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents