Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Boilers 3, 4, 5 and MCC Replacement Stickney Water Reclamation Plant Rebid
Renovation
Bidding
$17,825,000 CJ est. value
Cicero, IL 60804

Replace HVAC Systems William Rainey Harper College
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Palatine, IL 60067

Rebid Filters
Term Contract
Sub-Bidding
Palatine, IL 60074

Replacement of Rooftop HVAC Units
Alteration
Post-Bid
Chicago, IL 60612

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Desiccant Dehumidification System
Renovation
Sub-Bidding
$60,000 CJ est. value
Evanston, IL 60201

ABB HVAC Drives
Alteration
Post-Bid
IL

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

HVAC Supply House
Alteration
Post-Bid
IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

J043--Compressor Maintenance
Term Contract
Post-Bid
Hines, IL 60141

Last Updated 12/29/2022 03:10 PM
Project Title

HVAC Upgrades Project - Bid Group No. 1 Bid Package 01

Physical Address View project details and contacts
City, State (County) Berwyn, IL 60402   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Construction Manager - 11/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

Berwyn North School District 98 is accepting sealed bids for: HVAC Upgrades project. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. Bid security in the form of a Bid Bond, certified check or cashier's check made payable to the Berwyn North School District 98 in an amount equal to not less than ten percent (10%) of the Base Bid shall be submitted with the Bid. Bid security is required of all parties submitting a bid. A fully executed and compliant Bid Security must be included with the Bid Form. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Construction Manager for this project is Wight Construction Services, Inc. All questions concerning this project or those concerning bidding requirements should be directed to: Antoine Menassa at 312.533.1236 Questions must be received via email to amenassa@wightco.com no later than 12:00 PM (CDT) Tuesday, December 6, 2022. No bid shall be withdrawn after the opening of bids without the consent of the Chief Procurement Officer for a period of 60 days after the scheduled time of the bid opening. Berwyn North School District 98 reserves the right to reject any and all bids and to waive any informalities, technicalities and irregularities in the bidding. Bidders shall comply with all provisions and laws of the United States and State of Illinois concerning Public Works projects including but not limited to the Illinois Human Rights Act, and the regulations of the Illinois Human Rights Commission.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents