Similar Projects
J041--HVAC Controls Agreement | New/Base+4Oys
Term Contract
Design
Chillicothe, OH 45601

Summit County Jail HVAC and Plumbing Improvement Project
Alteration
Bidding
$10,260,000 est. value
Akron, OH 44311

Rickenbacker International Airport Lck Terminal Hvac Replacement
Alteration
Bidding
$225,000 est. value
Columbus, OH 43227

Eastland Fairfield Career Center - EFCC 2020 Improvements
Post-Bid
Less than $195,000 est. value
Groveport, OH 43125

Evaluation/Remediation of HVAC System at our Central Office
Post-Bid
Canton, OH 44702

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Replace Fan Coil Units Building 7 Sinclair Community College
Results
$200,000 est. value
Dayton, OH

2022 Bixby Cooling Tower Replacement
Alteration
Bidding
$175,000 est. value
Groveport, OH 43125

Air Handler Maintenance
Post-Bid
OH

District Wide HVAC Building Automation System Upgrades (1589)
Results
$473,209 est. value
Cleveland, OH 44115

HVAC Improvements -Leetonia Facility
Alteration
Bidding
Leetonia, OH 44431

Air Handler Maintenance
Post-Bid
OH

Wolstein Cooling Tower Repair Phase 1
Results
Cleveland, OH 44115

Crestwood High School HVAC System Improvement
Alteration
Bidding
Mantua, OH 44255

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

Last Updated 01/12/2022 08:11 AM
Project Title

Newark - HVAC Renovations

Physical Address View project details and contacts
City, State (County) Newark, OH   (Licking County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $267,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of an existing packaged RTU on the first floor roof of Hopewell Hall. The existing unit is a packaged DX cooling unit with hot water heat. The new unit will be of like design. Existing duct connection points to remain in the same place. Electrical power to RTU equipment will be replaced. Lightning protection system will be extended to new RTU. The single ply membrane roof system will require modifications to allow for the new unit and duct. A small portion of roof railing for fall protection.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents