Similar Projects
Last Updated | 05/17/2022 05:49 PM |
Project Title | Daniel Fernandez Youth Center - Phase IV Addition |
Physical Address | View project details and contacts |
City, State (County) | Los Lunas, NM 87031 (Valencia County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Clubhouse/Social Club, Site Development |
Contracting Method | |
Project Status | Construction Commenced May 2022, No Sub Bids Needed |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed Bids for the construction of a 19,642 SF gym addition to the existing recreation center at Daniel Fernandez Park located at 1103 NM 314 in Los Lunas, NM. The work includes: site grubbing, over excavation and imported / blended soil fill, auger cast concrete piles, concrete grade beams, concrete slabs, concrete unit masonry bearing walls, steel joists, steel deck roof support, and an insulated TPO roof system. Exterior finish consists of exterior insulation and finish system (EIFS). Interior partitions consist of light gauge steel studs with gypsum wallboard along with concrete unit masonry walls. Finishes include: polished concrete, rubber athletic flooring, resilient accessories, polyaspartic concrete coating, carpet tile and walk off carpet, tiled walls, window blinds, pipe railing with infill panels, and painted walls. Fenestration consists of aluminum storefront windows and doors, hollow metal doors and frames, and skylights. Interior openings consist of hollow metal frames with wood and hollow metal doors. Specialties include: athletic equipment including retractable basketball goals, volleyball sleeves, standards and nets, athletic scoreboards, fire extinguisher cabinets and fire extinguishers, toilet partitions and accessories, interior signage, and dimensional signage. HVAC system consists of gas fired roof top units providing heating and cooling. Plumbing fixtures consist of toilet room fixtures, hot water heating and tempering, and trench drainage. Electrical includes LED lighting, emergency lighting, convenience receptacles, power to HVAC equipment, and low voltage data. Fire suppression sprinkler installation throughout the addition, fed from the existing fire riser. Fire alarm expansion from the existing fire alarm panel. Site work includes construction of a fire access road and support concrete pad, concrete sidewalks, retaining wall, site lighting, site furnishings, and minor landscaping. Utilities include: installation of new electrical service, installation of new sewer line, and installation of a new natural gas line. |
||||||||||||||||||||||||||||||||||||||
Details | Athletic Facility, 19,642 SF Addition.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |