Similar Projects
Plaza Improvements
Renovation, Infrastructure
Post-Bid
Shawano, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Rehabilitation
Results
$275,000 est. value
Bonduel, WI 54107

Town of Bartelme, Camp 14 Road, CTH A - Reservation Highway 21
Results
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Summer Street at Village Road Pavement
Results
Aniwa, WI 54408

Wellers Lane Reconstruction
Results
Less than $180,000 est. value

Wittenberg - Shawano, CTH U Intersection
Results
Shawano, Wittenberg, WI

Bonduel - Cecil, Mutzy Lane - STH 22;
Results
Bonduel, WI

CTH U - STH 47, Red River Bridge
Results
WI

Roosevelt Road Resurfacing
Results
Tilleda, WI

Proposed Town Road Improvement Program (Trip) on Petersen Road for Pavingand Adding Gravel Shoulders
Infrastructure
Results
$107,357 est. value
Tigerton, WI

Elderon - USH 45
Infrastructure
Results
WI

Clintonville - Howard, Herman Creek Crossing
Infrastructure
Results
Clintonville, Howard, WI

Last Updated 01/18/2022 08:57 AM
Project Title

STH 22 - CTH H, Shawano Creek Bridge, B-58-136

Physical Address View project details and contacts
City, State (County) WI   (Shawano County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.000 Miles; Grade, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Beam Guard, Signing, Pavement Marking, and Structures. Excavation Common, 628 CY; Backfill Structure, 1,942 Ton; Base Aggregate Dense, 2,318 Ton; Select Crushed Material, 71 Ton; Breaker Run, 173 Ton; Concrete Pavement, 146 SY; Concrete asonry Bridges, 549 CY; Concrete Masonry Retaining Walls, 337 CY; Bar Steel Reinforcement, 21,640 Lbs; Bar Steel Reinforcement Coated, 102,490 Lbs; Structural Steel Stainless, 440 Lbs; Piling CIP Concrete, 1,480 LF 14-Inch; Marking Epoxy, 2,225 LF; Construction Staking, 1,700 LF; Construction Staking, 4 LS; Concrete Curb and Gutter, 110 LF; Beam Guard, 158 LF; Beam Guard Energy bsorbing Terminals, 4 Each; HMA Pavement, 794 Ton; Tack Coat, 106 Gals; Signs, 5 SF; Cofferdams, 2 LS; Riprap, 447 CY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents