Similar Projects
Manhole Rehabilitation at Saraland Wastewater Treatment Plant
Post-Bid
Saraland, AL

Annual Contract for 10" Lamphole Castings with Cover
Term Contract
Post-Bid
Mobile, AL

1500 Azalea Road Emergency Sewer Repair
Results
Less than $100,000 est. value
Mobile, AL 36693

Septic Tank Cleaning
Results
Less than $37,370 est. value
Mobile, AL 36618

Low Pressure Sewer Check Valve Assembly Installation Annual Contract 2022
Term Contract
Post-Bid
Mobile, AL

System Rehabilitation - Phase I
Results
Less than $1,143,120 est. value
Mobile, AL 36618

GOMESA Bellingrath Road Force Main Extension Phase B
Infrastructure
Post-Bid
Theodore, AL 36590

2021 Annual Contract for Cured-In-Place Pipe Rehabilitation of Large Diameter Sanitary Sewer Mains
Results
$2,757,200 est. value
Mobile, AL 36618

2022 Annual Contract for Replacement of Private Sanitary Sewer Laterals
Term Contract
Post-Bid
Mobile, AL

2019 CDBG Sewer Rehabilitation Project
Results
Chickasaw, AL

Enclose Rabby Creek
Infrastructure
Post-Bid
Mobile, AL 36615

Raintree South Sewer Extension
Results
Prichard, AL

Eslava Creek Force Main Replacement - Phase 2
Results
$15,137,460 est. value
Mobile, AL 36628

2021 Various Sewer Repair Locations
Infrastructure
Results
$858,000 est. value
Mobile, AL

2022 Annual Contract for Cured-In-Place Pipe for Small Diameter Sanitary Sewer Rehabilitation
Term Contract
Results
$996,750 est. value
Mobile, AL

Reported 05/03/2022 12:00 AM
Project Title

Eslava Creek Force Main Replacement - Phase 1

Physical Address View project details and contacts
City, State (County) Mobile, AL   (Mobile County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the project includes, but is not limited to the following: The construction of approximately 5,900 linear feet of thirty-six inch (36") sanitary sewer forcemain, bypass/crossover connections of the existing 48" PCCP to the new 36" forcemain, approximately 2,670 linear feet of bored HDPE sanitary sewer forcemain pipelines under Dog River and Dauphin Island Parkway, and approximately 350 linear feet of steel encasement installation, including 320 linear feet micro-tunnel under I10 and CSX Railroad with 54" steel encasement installations

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents