Similar Projects
Scum Concentrator Overhaul and Scum Press Replacement
Results
Oak Creek, WI 53154

Bar Screen Nos. 1, 2, 4, 7 and 8 Rehabilitation and Bar Screen No. 6 Replacement
Results
Milwaukee, WI 53207

Tunnel 271 Piping Replacement and Structural Repairs
Renovation
Results
Milwaukee, WI 53207

On-Call Construction Services for Repairs to Aeration Basins at South Shore Water Reclamation Facility
Renovation, Term Contract
Post-Bid
Oak Creek, WI 53154

Dryer 1 Ring and Pinion Gear Replacement and Alignment at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Dryer 2 Alignment, Tire and Trunnion Repairs and Non- Destructive Evaluation (Nde) at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Dryer 5 Trunnion Replacement and Alignment at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Dewatering and Drying Facility Standpipe Installation
New Construction
Results
Milwaukee, WI 53207

Jones Island Water Reclamation Facility Primary Clarifiers Drive Improvements
Renovation
Results
Milwaukee, WI 53207

Dryer Indefinite Quantity Services
Term Contract
Post-Bid
Milwaukee, WI 53207

Blending Improvements at South Shore Water Reclamation Facility
Renovation
Results
Oak Creek, WI 53154

Thickened Sludge Improvements
Renovation
Results
Milwaukee, WI 53207

Aeration Basin 11S Isolation Valve Replacement and Effluent Reuse Piping Repairs
Renovation
Results
Milwaukee, WI 53207

Field Staff Office Improvements
Renovation
Results
Milwaukee, WI 53207

West Plant Return Activated Sludge Channel Repair
Renovation
Bidding
Milwaukee, WI

Reported 04/01/2022 12:00 AM
Project Title

Primary Clarifier Drain Valve and Gate Actuator Replacement

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Jones Island Water Reclamation Facility, the Contractor will replace the drain valves of Primary Clarifiers 1, 2, 3, 4, 5, and 7 and replace effluent gate actuators for Primary Clarifiers 1, 2, 3, 5, 6, 7, and 8. The Contract Operator will take specific primary clarifiers out of service when the Contractor will be working on them

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents