Similar Projects
Last Updated | 03/30/2023 03:14 PM |
Project Title | Lilburn Middle School - HVAC Modifications |
Physical Address | View project details and contacts |
City, State (County) | Lilburn, GA 30047 (Gwinnett County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of replacement of outside air units with new Energy Recovery Units, including removal of related dehumidification water source heat pump units Gwinnett County Public Schools' fax machines and computers shall not be used to receive faxes or e- mails for bidders Contract, if awarded, will be on a lump sum basis. Bids may not be withdrawn for a period of sixty (60) days after the date of receipt of bids. Bids shall be accompanied by a bid bond payable to Gwinnett County Board of Education in an amount equal to five percent of the base bid (Certified Checks NOT Acceptable). Performance Bond and Labor and Material Payment Bond, each amount equal to 100 percent of the contract sum, will be required of the successful bidder. These bonds shall be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of The Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement The Owner will make progress payments to the successful contractor upon receipt of request for payment having been certified by the Architect as fully covered and shown in Contract Documents. The Owner will make progress payments to the successful contractor upon receipt of request for payment having been certified by the Architect as fully covered and shown in Contract Documents. Plans and specifications will be released only to Contractors who have been Pre-Qualified by the Owner. Obtain documents by sending an email to mike@spurlock-eng.com and copy drake@spurlockeng.com. Bid deposits are non-refundable |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |