Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

HVAC & Refrigeration Replacement / Maintenance
Term Contract
Post-Bid

Eastern Chiller Replacement
Results
Willow Grove, PA 19090

HVAC Preventative Maintenance Program for the Montgomery County Correctional Facility
Results
$31,000 est. value
Eagleville, PA 19403

Chiller Replacements at the Gwynedd Square Elementary School
Post-Bid
Lansdale, PA 19446

Magnetic Bearing Centrifugal Chillers Abington Junior High School
Results
Abington, PA 19001

Library HVAC Alterations at Pennbrook Middle School
Post-Bid
North Wales, PA 19454

HVAC Unit Replacments & Electrical Upgrades
Results
Less than $180,000 est. value
East Greenville, PA 18041

Township Administration Building RTU 2 Replacement - General Construction
Results
$90,000 to $95,000 est. value
Ardmore, PA

Window Air Conditioner & Electrical Installation
Results
Dresher, Maple Glen, PA 19002

1605 West Main Street Renovation and Upgrade Project - HVAC
Results
$2,330,000 est. value
Norristown, PA 19403

Rooftop HVAC Unit Replacement
Results
Bridgeport, PA 19405

New Sandy Run Middle School Contract No. 2 - HVAC Construction
Results
Dresher, PA 19025

Construction of a New Picnic Pavilion
Results
Skippack, PA 19474

New Colonial Middle School - HVAC
Results
Plymouth Meeting, PA 19462

Last Updated 05/24/2019 10:34 AM
Project Title

Township Administration Building RTU 2 Replacement - HVAC Construction

Physical Address View project details and contacts
City, State (County) Ardmore, PA   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $190,000 to $195,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of the 105-ton rooftop unit, RTU-2. The work includes, but is not limited to, selective demolition; erection of steel dunnage; modification of the existing EPDM roof; infill of the former roof curb opening with deck and new EPDM roof system; replacement of RTU-2, including integration with the existing BMS; installation of transition ductwork and associated appurtenances; and associated incidental electrical work.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents