Similar Projects
Extra Space Storage - Building G
New Construction - 113,282 SF
Conception
Daytona Beach, FL 32117

Thompson Pump & Manufacturing
New Construction - 163,141 SF
Design
Port Orange, FL 32129

Ocean Club Storage Warehouse
New Construction - 4,000 SF
Design
Daytona Beach, FL 32114

Removal and Replacement of Unleaded Above Ground Storage Tank at City of Deland Public Works
Post-Bid
Less than $60,000 est. value
De Land, FL 32720

Warehouse Storage Building
Results
Less than $87,500 est. value
New Smyrna Beach, FL 32170

Design/Build Public Works Storage Building
New Construction - 4,800 SF
Results
Holly Hill, FL 32117

Boston Whaler Expansion
New Construction - 326,000 SF
Construction
$42,000,000 est. value
Edgewater, FL 32141

Boston Whaler Expansion
New Construction - 326,000 SF
Construction
$42,000,000 est. value
Edgewater, FL 32141

Copper Safe Storage
New Construction - 48,000 SF
Design
$4,000,000 est. value
De Land, FL 32724

Parks Maintenance Renovations Equipment Storage
Results
Less than $157,708 est. value
Port Orange, FL 32129

Stetson University Golf Practice Greens
New Construction - 3,150 SF
Construction
De Land, FL 32724

Brightside Storage
New Construction - 57,717 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Deltona, FL 32725

Mr. Happy Storage
New Construction
Construction
$30,000 est. value
Daytona Beach, FL 32114

Donatti Mini Warehouse Storage
New Construction - 41,516 SF
Design
$1,000,000 to $5,000,000 CJ est. value
New Smyrna Beach, FL

Amazon Distribution Center
New Construction - 1,400,000 SF
Construction
Deltona, FL 32725

Last Updated 05/13/2020 04:36 PM
Project Title

Costa Del Mar Headquarters

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32114   (Volusia County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Warehouse/Storage
Contracting Method
Project Status Building in Operation as of April 2020
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Each building will include office space

Details

1 Manufacturing/Processing Plant, 2 Stories Above Grade, 67,200 SF New Construction, 1 Warehouse/Storage, 1 Story Above Grade, 10,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents