Similar Projects
Roadside Assistance Services
Post-Bid
FL

Picayune Strand Restoration Project, Miller Tram and Road Removal and Associated Works, Collier County, FL
Results
$9,000,000 to $14,000,000 est. value
FL

Immokalee Road (CR 846) at Woodcrest Drive Intersection Improvements
Results
Less than $1,366,910 est. value
Naples, FL 34120

Thomasson Drive Beautification Project
Results
Less than $5,100,000 est. value
FL

Yellowbird Street Roadway and Utility Reconstruction Project
Results
Marco Island, FL 34145

Design Build of Veteran Memorial Boulevard Extension - Phase 1
Results
Less than $8,800,000 est. value
Naples, FL 34112

Annual Street Resurfacing
Term Contract
Results
Less than $535,000 est. value
Marco Island, FL 34145

Pre-Event Emergency Roadside Assistance Services (ERA) (I-75)
Results

Designated Driveway Contractor Services
Term Contract
Results
Naples, FL 34112

Triangle Boulevard Transportation Operational Improvements
Results
Less than $4,183,000 est. value
Naples, FL 34113

Goodland Drive Rehabilitation Project
Results
Less than $2,400,000 est. value
FL

Public Infrastructure Construction Services
Term Contract
Results
Marco Island, FL

Zocalo Plaza Improvements - Immokalee CRA
Results
FL

Asphalt Patching, Sealcoating and Striping
Results
Naples, FL 34102

Roadway Contractor Services
Term Contract
Results
FL

Last Updated 06/15/2020 10:20 AM
Project Title

Design-Build - Step 1 - for Whipporwill Lane Marbella Lakes Drive Connection

Physical Address View project details and contacts
City, State (County) Naples, FL 34116   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,250,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design-build teams for the design and construction of improvements to Whippoorwill Lane and Marbella Lakes Drive Connection (herein after referred to as “PROJECT”). The project is located on Whippoorwill Lane and Marbella Lakes Drive. The target substantial completion date is 465 calendar days from Notice to Proceed. Project budget, proposed location, estimated schedule and general project information are indicated in Scope of Work, Attachments, etc..

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents