Similar Projects
Indian Trail Townhomes
New Construction, Infrastructure - 275,000 SF
Conception
$10,000,000 CJ est. value
Spokane, WA

Oak Harbor Intermediate School
New Construction, Renovation
Conception
Oak Harbor, WA 98277

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

KCAC Hvac and Poolpak Replacement
Alteration
Design
$1,500,000 est. value
WA

Renton High School Science Classrooms Modernization Project
Renovation
Bidding
Renton, WA 98057

Arletta Schoolhouse Renovation
Renovation
Bidding
Gig Harbor, WA 98335

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Bidwell Pool Replaster
Infrastructure
Post-Bid
$50,000 est. value
Colbert, WA 99005

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Spokane Valley, WA 99206

The Modera Vancouver
New Construction, Infrastructure - 203,400 SF
Pending Verification
$10,000,000 CJ est. value
Vancouver, WA

New K-4 Elementary School
New Construction, Renovation, Addition
Conception
Ridgefield, WA

High School Addition
New Construction, Addition - 15,000 SF
Design
Ridgefield, WA

Construction of the East Valley School District Sports Fields project
New Construction
Bidding
$4,500,000 est. value
Spokane Valley, WA 99216

Last Updated 01/18/2022 02:05 PM
Project Title

South Kitsap High School Pool Renovation

Physical Address View project details and contacts
City, State (County) Port Orchard, WA 98366   (Kitsap County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Middle/Senior High School, Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,800,000 to $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a standalone 20,000 SF indoor aquatic center. Scope includes: removing hydraulic movable pool floor and bulkhead, replacement of the poor deck and pool lining, pool equipment, water treatment system, building HVAC, electrical, lighting, roofing, doors, borrowed lites, storefronts, plumbing fixtures in locker rooms, addressing ADA accessibility, misc. architectural casework and finish carpentry, site improvements to include sidewalks and parking lot.

Details

Middle/Senior High School, 20,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents