Similar Projects
Eastlake Layover Facility
New Construction
Conception
$10,000,000 est. value
WA

West Duwamish CSO Storage
New Construction
Conception
$32,000,000 est. value
WA

21 Boston Mixed Use Development
New Construction - 273,000 SF
Design
Seattle, WA 98109

South MATOC IDIQ On-Ramp
New Construction
Design
Less than $30,000,000 est. value

USPS IQ JOC Washington
New Construction, Renovation
Bidding
Less than $10,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Post-Bid

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

SWD And CKFR Admin. Building Expansion
Renovation, Addition
Results
$1,818,000 est. value

Dutchman Construction
New Construction
Conception
$5,830,000 est. value
WA

Central Maintenance Facility
New Construction
Design
$29,000,000 est. value
WA

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Willowmoor Construction
New Construction
Conception
$10,000,000 est. value
WA

Central Maintenance Facility
New Construction
Design
$29,000,000 est. value
WA

Old Jeffs Farm Revetment
New Construction
Conception
$2,900,000 est. value
WA

NAVFAC Northwest 8(a) Small Multiple Award Construction Contract (MACC) Regional Contract
New Construction, Renovation, Demolition, Alteration
Design
Less than $400,000,000 est. value

Reported 12/21/2021 12:00 AM
Project Title

GSA PBS Region 10 Western MATOC for Construction, Alteration or Repair of Buildings, Structures, or Other Real Property

Physical Address View project details and contacts
City, State (County) Auburn, WA   (King County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $2,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Indefinite-delivery, indefinite quantity (IDIQ) multiple award task order contract (MATOC) for the construction, alteration, or repair of buildings, structures, or other real property of GSA Region 10, western region. Contractors will be responsible for responding to task orders to deliver projects to federal controlled assets. Contractors may be required to provide shop drawings, product specifications/data, equipment, specifications, and material data sheets. Work under this contract may include, but is not limited to, mechanical, electrical, plumbing, structural, roofing, building renovations, demolition, concrete, fire/life safety systems, abatement of asbestos, remediation of mold, painting, carpet installation, interior and exterior finishes, and drywall. In addition to construction, contractors may be expected to provide construction management services as well as professional services of an architectural or engineering nature in support of construction projects. Contractors must provide all management, supervision, labor, materials, equipment, transportation, disposal, tools, and coordination.

Details

Misc. Buildings, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents