Similar Projects
Brake Lane and Slope Hill
Infrastructure
Bidding
Greenville, SC

Drainage Improvements Adjacent to Campbell Chapel AME Church
Alteration
Bidding
Bluffton, SC 29910

Drainage Improvements North Side
Post-Bid
Aynor, SC 29511

District 2 On-Call Pipe Repair
Post-Bid

Drainage Improvements Project at Bryson Elementary School
Results
Simpsonville, SC 29681

Dunoon Drive Drainage Improvement Project
Results
Less than $64,640 est. value
Charleston, SC 29401

Dewitt Road Outfall Ditch Project
Infrastructure
Bidding
SC

Pipe Cleaning and Lining
Post-Bid
Columbia, SC 29202

Accabee Drainage Improvement - Phase II
Results
Less than $622,420 est. value
North Charleston, SC 29419

Pipe Lining-Oconee Maint
Infrastructure
Bidding
Westminster, SC

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

Lynnhurst Subdivision Drainage Improvements
Results
$500,000 to $800,000 est. value
North Augusta, SC 29841

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Bidding
Charleston, SC

Huger Street and King Street Intersection Drainage Improvements Project
Post-Bid
Charleston, SC

Install HDP Pipe US15 S16-23 Old Camden
Term Contract
Results
SC

Last Updated 09/06/2021 02:54 AM
Project Title

Cherokee Pipe Repair

Physical Address View project details and contacts
City, State (County) Blacksburg, SC 29702   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking bids to repair one (1) 3’ x 6’10” arch culvert pipe and 24” diameter HDPE Pipe that is approx. 118’ feet in total length. The repair should include dam and dewater, cleaning, injection grouting, prep and spin cast of the pipe which is located on North Mountain Street in Cherokee County near the NC State Line just east of Buffalo Creek. (SC 198, MP2.53). This includes the repair of the existing arch culvert and repair and create a smooth transition of the 24” diameter pipe.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents