Similar Projects
Camp Davis North Runway Erosion Repair
Design
Camp Lejeune, NC 28547

Headwall - Twin Run
Bidding
Boiling Spring Lakes, NC 28461

Canal Bridge / Erosion Control Maintenance
Bidding
South Mills, NC

Toby Creek and Mallard Creek Stream Rehabilitation
Post-Bid
Charlotte, NC

18" N-12 HDPE IB/WT Double Wall
Post-Bid
Jacksonville, NC 28541

Dorothea Drive Drainage Improvements (Formal)
Results
Raleigh, NC

North Academic Drive Renovation Project
Results
Less than $1,808,000 est. value
NC

Walkertown Park Retaining Wall Construction
Bidding
Walkertown, NC 27051

Charlotte Readiness Center Erosion Remediation Project Package 1B
Post-Bid
Charlotte, NC 28208

Arlington Boulevard Improvements Hooker Road to Greenville Boulevard Project
Results
Greenville, NC

City View Mcalpine Stream Project
Bidding
$817,433 est. value
Charlotte, NC

Tree and Debris Removal and Removal and Replacement of Damaged Lateral Crossing Culverts
Post-Bid
Smithfield, NC 27577

Bass Lake Stream Channel Improvements
Results
Less than $836,800 est. value
Holly Springs, NC

Corrugated Aluminized Pipe
Bidding
Polkton, NC 28135

Range 190E Erosion Control
Post-Bid
$500,000 to $1,000,000 est. value
Fort Bragg, NC

Last Updated 02/23/2021 04:43 AM
Project Title

Aluminum Structural Plate Pipe Arch-Headwall

Physical Address View project details and contacts
City, State (County) Mebane, NC 27302   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 1 Each 72 LF – 17’-3” span x 11’-0” rise, 0.150” metal thickness, aluminum structural plate pipe arch with type II ribs on 54” centers fully welded inside and out to a 27’-0” wide x 15.20’ high aluminum structural plate headwall, 0.200” metal thickness, with two (2) - 9’-0” wide aluminum structural plate wing walls on inlet end and a 45’-0” wide x 15.92’ high aluminum structural plate headwall, 0.200” metal thickness, aluminum structural plate headwall on outlet end per attached drawing. Includes two (2) rolls of TX160 Geogrid. Aluminum stiffening rib bolted to soil side of wall.Supplier to assemble structure and headwalls in the final designed location and elevation with one (1) working day onsite. LRFD HL-93 Loading Minimum Cover – 3.0’ Maximum Cover – 7.0’ Open Area of Pipe Arch – 146.7 SQ. FT.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents