Similar Projects
Range 190E Erosion Control
Post-Bid
$500,000 to $1,000,000 est. value
Fort Bragg, NC

Headquarters Library Slope Repair
Post-Bid
Fayetteville, NC 28301

Headwall
Term Contract
Results
Fayetteville, NC 28304

Rankin Street Drainage Improvements
Results
Fayetteville, NC

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Post-Bid
Fayetteville, NC 28307

Distribution Drive Structural Repairs for Aerial Crossing
Results
Fayetteville, NC 28302

Reinforced Concrete Pipe
Term Contract
Post-Bid
Fayetteville, NC 28302

Drainage Assistance Project Iverleigh Circle and Rolling Hill Road
Results
Fayetteville, NC 28302

Fayetteville Regional Airport Embankment and Pipe Repairs
Post-Bid
Fayetteville, NC

Carnsmore Drainage Improvements
Results
Fayetteville, NC 28304

Drainage Assistance Project Daytona Road
Post-Bid
Fayetteville, NC 28311

Aluminum Box Culvert with Headwalls
Results
Fayetteville, NC 28301

Corrugated Aluminum Pipe
Post-Bid
Fayetteville, NC 28306

Headwall
Results
Fayetteville, NC 28301

Drainage Assistance Program 502 Argyll Road
Results
Fayetteville, NC 28301

Last Updated 04/21/2020 08:47 AM
Project Title

Cross Creek Hurricane Repair and Bank Stabilization

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hurricane Matthew significantly damaged the left bank of Cross Creek at Lamont Street. Hurricane Florence and subsequent flood-stage waters further damaged the left bank. The purpose of this project is to install permanent sheet piles to preclude further erosion of the slope and stream bank, to replace sections of greenway trail, and to install engineered systems in the creek channel. The repair includes over 18,000 square feet of sheet pile wall, restoration and installation of stream channel controls, and both demolition and replacement of asphalt greenway trail.

Details

Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Paving Removal.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Shoring, Sheet Piling.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents