Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

Bulwagga Bay Campground Shoreline Assessment and Remediation Plan
Post-Bid
Port Henry, NY 12974

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

West Street Drainage Outlet Remediation
Post-Bid
Harrison, NY 10528

Gooseberry Creek Revitalization Strategy – Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Corrugated Metal Pipe Arches
Post-Bid
Fort Edward, NY 12828

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Culvert and Underdrain Pipe and Tubing W/ Arches Bands and Accessories
Term Contract
Post-Bid

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Post-Bid
Ballston Spa, NY 12020

Richbell Road Drainage Improvements at Ridgeway to Ethelridge Road
Results
White Plains, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Last Updated 12/21/2020 08:53 AM
Project Title

Governor`s Office of Storm Recovery Mastic Beach Drainage Improvements CR12 General Construction

Physical Address View project details and contacts
City, State (County) Farmingville, NY 11738   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,025,000 to $2,406,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve the ability of several existing drainage systems within the Mastic Beach area to manage storm-water runoff and prevent backflow of seawater into the systems. Drainage systems are located along existing roadways within mainly residential areas. Topographically, the project sites are generally flat, and groundwater was found to be within 2 feet of existing grade at all project locations except Neighborhood Road (DS-24). Contractor staging and storage areas will be coordinated with the Town of Brookhaven. The Contractor is responsible for obtaining dewatering permits. Coordination with utility companies for facility relocation and protection is anticipated in most project areas. Drainage improvements are proposed at eight different project locations in the Mastic Beach area. The specific project areas and the improvements proposed at each location are as follows: Maywood Drive (DS-12): Remove and replace the existing drainage system. Re-size and adjust pipe invert elevations to improve system conveyance capacity. Restore pavement to match existing conditions. Hickory Road to Huntington Drive (DS-13): Remove and replace the existing drainage system. Resize and adjust pipe invert elevations to improve system conveyance capacity. Install check valve prior to outfall into downstream waterbody. Restore disturbed wetland area. Repair existing timber bulkhead. Neighborhood Road (DS-24): Remove and replace the existing drainage system. Re-size and adjust pipe invert elevations to improve system conveyance capacity. Install water quality treatment device prior to discharge into downstream water body. Restore pavement, sidewalk and curb to match existing conditions. Curb ramps to be replaced will be installed to meet ADA requirements. Add Alternate 1: Gooseberry Road (DS-11): Remove and replace the existing drainage system. Re-size and adjust pipe invert elevations to improve system conveyance capacity. Install pipe outlet with flared end section and rock outlet protection. Restore pavement to match existing conditions. Construct wetland mitigation area. Add Alternate 2: Riviera Drive (DS-14, DS-15 and DS-16): Remove and replace portions of existing drainage systems at multiple locations on Riviera Drive. Re-size and adjust pipe invert elevations to improve system conveyance capacity. Install check valve prior to outfall into downstream waterbody. Restore pavement to match existing conditions. Floral Court (DS-17): Remove and replace existing catch basin with a larger drainage structure. Install check valve prior to outfall into downstream waterbody. Restore pavement to match existing conditions.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents