Similar Projects
High Expansion Foam Install with Pumphouse
New Construction
Design
$1,000,000 to $5,000,000 est. value
Middle River, MD

MCC Replacement – Green Branch Wastewater and Mill Branch Wastewater Pump Station
Bidding
Laurel, MD

Heritage Harbor 2 Sewage Pumping Station
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Stony Run Wastewater Pumping Station Upgrade
Results
$2,500,000 to $5,000,000 est. value
Baltimore, MD

Cedar Lane Water Pumping Station
Results
$2,500,000 to $5,000,000 est. value
MD

Heritage Harbor 2 Sewage Pumping Station Upgrades
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Colgate Stormwater Pumping Station Upgrade
Results
$2,000,000 to $3,000,000 est. value
Baltimore, MD

Construction of Newark Spray Irrigation Facilities
Results
Snow Hill, MD 21863

Smouses Mill Pumping Station Upgrades
Results
$125,000 est. value
Cumberland, MD 21502

Refurbishment of Little Anacostia Wastewater Pumping Station
Renovation
Results
$5,000,000 to $7,000,000 est. value
Capitol Heights, MD 20781

Daniels Area Wastewater Pump Station
Results
Less than $1,505,000 est. value
Columbia, MD 21046

Hyde Park Pumping Station Improvements—Consent Decree
Results
$2,500,001 to $5,000,000 est. value
Hydes, MD 21221

Cockeysville Pumping Station Improvements
Renovation
Results
$5,000,001 to $10,000,000 est. value
Cockeysville, MD 21030

Reported 08/19/2020 12:00 AM
Project Title

Martingham Distribution Pump Replacement

Physical Address View project details and contacts
City, State (County) Saint Michaels, MD 21663   (Talbot County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a water booster pump station with the ability to collectively supply a peak of 350 gallons per minute with 130 feet TDH, installation of flanged piping and MAG Meter, including replacement existing electrical components, painting, exterior door installation, concrete demolition and repair, and all necessary appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents