Last Updated 12/10/2020 11:38 AM
Project Title

NW Fairview Community Sewer Extension Phase 2

Physical Address View project details and contacts
City, State (County) McDonough, GA 30253   (Henry County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be completed shall consist of furnishing all labor, equipment, and materials necessary to install approximately 3,569 linear feet of 8 inch diameter sanitary sewer mains complete with 14 manholes, 1 metering manhole, 1 sanitary sewer pump station decommissioning/abandonment or bypass, jack & bore 120 LF of 16" diameter steel casing, open cut 110 LF of 16" diameter steel casing, backup generator and SCADA for existing Phase 1 pump station, asphalt, concrete, and gravel roadway and driveway replacement, earthwork, soil erosion and sediment control measures, and appurtenances necessary to provide complete installation.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents