Similar Projects
Riverside High School and Middle School Alterations - HVAC Construction
Bidding
Riverside, NJ 08075

Building Management System
Bidding

Pemberton High School Gym A. HVAC Renovations
Post-Bid
Pemberton, NJ 08068

Lumberton Middle School Roof Top Units
Post-Bid
$189,000 est. value
Lumberton, NJ 08048

Boiler Maintenance, Repair and Emergency Replacement
Results

Burlington County DPW Engineering and Traffic Control Buildings Arch and MEP Improvements
Results
Mount Laurel, NJ 08060

Mechanical Upgrades - Partial Roof Top Unit Replacement
Bidding
Washington, NJ 07882

HVAC System at the Public Works Garage
Post-Bid
Burlington, NJ 08016

Lenape High School Chiller Replacement
Results
Medford, NJ

Inspection, Maintenance, Testing, Repair, and Emergency Services for the American Air Filter (AAF) Roto-Clone Dust Particle Removal Systems at PATH Harrison Car Maintenance Facility (HCMF)
Term Contract
Bidding

Maple Shade School District Independent Mechanical System Testing Adjusting and Balancing Services - Ralph J. Steinhauer Elementary School, Maude Wilkins Elementary School and Howard Yocum Elementary School and Maple Shade High School
Post-Bid
Maple Shade, NJ 08052

HVAC-R Services
Results
Pemberton, NJ 08068

Air Conditioning, Refrigeration, and Chiller Maintenance and Repair
Term Contract
Post-Bid
NJ

HVAC Renovations (Phase 4) at Northern Burlington County Regional High School
Results
$1,360,000 est. value
Columbus, NJ 08022

Geothermal System Maintenance
Term Contract
Post-Bid
Westampton, NJ 08060

Last Updated 01/13/2021 02:29 PM
Project Title

Install Ductless Multi Zone Heat Pump

Physical Address View project details and contacts
City, State (County) McGuire AFB, NJ 08640   (Burlington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide and install a new 5 ton Multi Zone Ductless Heat Pump for room C103. The new unit shall have (4) ceiling cassettes with a master wall mounted control along with individual remote controls. New unit shall include a dehumidifying operation mode. New unit shall have a minimum 20 SEER. New unit can be a LG MN-L4H60C12121212 or approved equal.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents