Last Updated | 01/18/2023 11:53 AM |
Project Title | RFQ Design - Weill Hall Replace Built-Up Roofing and Modified Bituminous Roofing |
Physical Address | View project details and contacts |
City, State (County) | Berkeley, CA 94704 (Alameda County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Berkeley Campus of the University of California is seeking a Roofing Consultant ("Consultant") to perform design services and other support services as required by the Executive Design Professional Agreement ("EDPA") for the following roofing replacement projects: Weill Hall: Full flat roof replacement (not including sloped tile roofing), anticipated new roofing is built up; lightweight concrete underlayment moisture testing and mitigation as needed; flashing replacement (galvanized), roof drain testing and replacement as needed; majority of roofing material resides under and around extensive rooftop mechanical equipment including extensive piping and raised walkway; site coordination and documentation as needed to identify unique conditions. Latimer Hall: Roof replacement of penthouse roof with upper and lower penthouse roof areas as add alternates; new roofing is anticipated to be PVC; flashing replacement (galvanized); gutter assessment (anticipated to remain); insulation replacement; roof drain testing and replacement as needed. The University anticipates proceeding with the project on an aggressive schedule. Construction to start in June 2023. Deadline for questions August 19, 2022 2:00 pm PST. Response to questions No later than August 23, 2022 Responses will be issued as addenda via portal. The Method of Contractor Selection has not been determined at this time. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |