Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Water Meter Replacements
Post-Bid
Jennings, FL 32053

Water System Improvements
Post-Bid
Less than $400,000 est. value
Caryville, FL 32427

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

Downtown Utility Replacements
Results
Less than $740,000 est. value
Dunnellon, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Utility Metering
Term Contract
Post-Bid
Orlando, FL 32816

F--Water Chlorine, Bldg Monitoring
Results
Orlando, FL 32827

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Sable Creek Potable Water Improvements
Results
FL

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Last Updated 12/13/2019 03:48 PM
Project Title

City of Minneola Water Distribution System Improvements Areas 2 and 3

Physical Address View project details and contacts
City, State (County) Minneola, FL 34715   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing, delivering and installing all materials, equipment and services, including labor, for the Work, which generally includes the installation of approximately 3,700 LF of 8-inch PVC potable water main approximately 240 LF of 8-inch DIP potable water main, 3,400 LF of 12-inch PVC potable water main, approximately 200 LF of 12-inch DIP potable water main, and approximately 140 LF of 10-inch and 65 LF of 14-inch high density polyethylene potable water main to be installed via directional drill, water services, installation of valves, hydrants, tapping sleeve, and miscellaneous appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents