Similar Projects
Route 31 from Route 173 to South Lincoln Avenue /Hawke Point Boulevard
Bidding
Less than $5,000,000 est. value
Clinton, Glen Gardner, Hampton, Lebanon, Washington, NJ 07882

Maintenance Roadway Contract N109
Bidding
$10,000,001 to $20,000,000 est. value

Washington Township 2018 Road Program - Phase 1
Post-Bid
Washington, NJ

Washington Township 2018 Road Program - Phase 2
Post-Bid
Washington, NJ

Heckman Street Phase 1 and 2
Results
Phillipsburg, NJ

Maintenance Resurfacing Contract, Central - 2019; Various Locations; Hunterdon, Mercer, Middlesex, Monmouth, Ocean, Somerset and Warren Counties
Results
$5,000,001 to $10,000,000 est. value

Maintenance Job Order Contracting (JOC) Infrastructure Repairs, Central - 2020
Bidding
$5,000,001 to $10,000,000 est. value

Asphalt Paving at Five Lukoil Service Stations
Renovation
Post-Bid

Maintenance Resurfacing Contract, North - 2019; Various Locations; Bergen, Essex, Hudson, Morris, Passaic, Sussex, Union and Warren Counties
Results
$5,000,001 to $10,000,000 est. value

Maintenance Job Order Contracting (JOC) Infrastructure Repairs, North - 2020
Bidding
$5,000,000 to $10,000,000 est. value

2019 Road Program (NJDOT FY 2019 LAIF Grant, Improvements to North Boulevard, Phase III)
Post-Bid
Alpha, NJ 08865

Route 57 Fromroute 22 Toroute 31, Resurfacing
Results
$5,000,001 to $10,000,000 est. value
NJ

Marble Hill Road Improvements Phase 1 and 2
Post-Bid
Great Meadows, NJ

Enmore Road and Oxford Road Improvement Project
Results
Phillipsburg, NJ

2020 Road Program
Post-Bid
Alpha, NJ 08865

Reported 03/29/2019 12:00 AM
Project Title

Construction of the Proposed Road Improvements on Nestling Wood Drive and Acorn Drive

Physical Address View project details and contacts
City, State (County) Washington, NJ   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Construction of the Proposed Road Improvements on Nestling Wood Drive and Acorn Drive. The work to be performed consists of the furnishing of all labor, equipment, materials and all else necessary to mill, repair and overlay roadway including 12,810 square yards of 2" milling and 2,250 tons of road pavement for Alternate A and 20,730 square yards of 2" milling and 4,295 tons of road pavement for Alternate B. The Contractor must commence work after June 21, 2019 and complete all work by July 24, 2019 for Alternate A and August 15, 2019 for Alternate B.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents