Similar Projects
Summerville Prepatory Academy
New Construction - 42,900 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29485

Various Renovations To Florence 1 Schools Fy20-21 (No.4)
Renovation
Bidding
Florence, SC

Portable Classroom Unit Relocation Services
Post-Bid
Aiken, SC 29803

Florence 1 Schools: Various Renovations to Florence 1 Schools (No.2)
Renovation
Post-Bid
Effingham, Florence, SC 29501

Construction Management at Risk Services for Capital Improvements Program
New Construction, Renovation
Results
Abbeville, SC 29620

Pre-Construction/Construction Phase (CM at Risk) Services for Capital Renewal Renovations and Modifications Project
Renovation, Addition, Term Contract
Results
Beaufort, SC 29901

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Construction Services to Convert the Existing Myrtle Beach Middle School to the New MBES
Construction
Myrtle Beach, SC 29577

Professional Design-Build Services - Weight Rooms
Post-Bid
Taylors, SC

Construction Management at Risk Services
Results
Batesburg-Leesville, SC

Heyward Career and Technology Center Culinary Arts and Classroom Additions
Addition
Construction
Columbia, SC

Construction Management Services
Post-Bid
Clover, SC

Sullivan Middle School Athletic Restroom/Concession Building
Results
Rock Hill, SC 29730

Carvers Bay Middle School Renovation
Renovation
Construction
$4,200,000 est. value
Hemingway, SC 29554

Professional Design-Build Services - Career Center Programs
Post-Bid
Greenville, SC

Last Updated 04/23/2020 02:33 PM
Project Title

MBIS Renovations for Records, Science Kits, and Adult Education

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC 29577   (Horry County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $560,047
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes performing demolition and new work to allow for renovations of the former Myrtle Beach Intermediate School to a facility that will house Records, Science Kits, and Adult Education. The work is scheduled to start May 2020.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents