Similar Projects
Reported | 07/30/2022 12:00 AM |
Project Title | Design - AE Upgrade Storm Water System Brockton MA |
Physical Address | View project details and contacts |
City, State (County) | Brockton, MA 02301 (Plymouth County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected July 2023, |
Bids Due | View project details and contacts |
Estimated Value | $3,500,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all professional architectural and engineering (A/E) services necessary to develop complete drawings, specifications, cost estimates, construction schedules, project phasing, investigations, site visits and construction period services associated with improving Stormwater Drainage Systems at various campus wide locations at the Veterans Administration, Boston Healthcare System (VA BHS), Brockton Campus, 940 Belmont Street, Brockton, MA. Conduct preliminary project scope meetings and site survey investigations to develop the necessary elements for conceptual layout schemes with proposed alternatives consistent with the VA s project team goals as prioritized during preliminary project meetings, field surveys and studies. The intent of this project is to improve existing stormwater drainage systems to current Veterans Health Administration (VHA) design and construction standards. This project shall improve stormwater drainage and patient safety around Buildings through the design and construction of the drainage system. General Conduct preliminary meetings and site survey investigations to define the necessary elements of the project scope of work fulfilling the goals of the VA s project team (Engineering Service), and presentation of preliminary layout plans with proposed alternatives to the User Group. Based on User Group meetings and site surveys, prepare a detailed project plan description report pertinent to the project requirements within the constraints of the construction budget consistent with the VA s project team goals. Through the course of the design phase, it will be necessary to interface with Medical Center staff to ascertain the details of the scope through a series of meetings and periodic submissions of documents. |
Details | Architectural, Renovation. |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |