Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

North Mendota Trail Paving
Infrastructure
Bidding
Waunakee, WI 53597

2022 Street and Utility Improvements - Contract A
Infrastructure
Bidding
Marshall, WI 53559

Parking Lot Improvements Salmo Pond County Park
Infrastructure
Post-Bid
Black Earth, WI 53515

Concrete Sidewalk at Warner Park Community Recreation Center
Infrastructure
Post-Bid
Madison, WI 53704

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

2022 Street and Utility Improvements - Contract B
Infrastructure
Bidding
Marshall, WI 53559

Western Green Park Trail Construction - Old Indian Trail to Main Street
Infrastructure
Post-Bid
Deforest, WI 53532

Spring Green - Madison, Walter Road
Results
WI

2022 Asphalt Street Rehabilitation
Infrastructure
Bidding
$240,000 est. value
Verona, WI

West Mohawk Trail and Clover Lane Street Resurfacing and TID 8 Access Road Removal
Infrastructure
Post-Bid
Deforest, WI 53532

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

North Bristol Street Pavement Rehabilitation
Infrastructure
Bidding
$1,400,000 est. value
Sun Prairie, WI 53590

Last Updated 02/23/2022 11:35 AM
Project Title

Construct Valley Gutter Medford Readiness Center

Physical Address View project details and contacts
City, State (County) Madison, Medford, WI 54451 (Dane, Taylor Counties)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Wisconsin National Guard Readiness Center located in Medford, WI was constructed with an asphalt valley for stormwater drainage located in the public access parking lot. Over time, the asphalt valley has deteriorated to the point where corrective measures are required. The project will require construction of a reinforced concrete valley gutter to provide a better long-term drainage feature through the parking lot. More specifically, this project involves saw cutting and removal of asphalt pavement and removal of a deteriorated sidewalk. New construction items that are required include new concrete curb and gutter, reinforced concrete valley gutter, new sidewalk, and construction of new asphalt pavement in the patch area between the sawcut and valley gutter. The project also includes erosion control as necessary, backfilling, site / turf restoration, and site cleanup.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents