Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Oak (Flanders Mill to Ryun Sun Way) - SIF057 - City of Bozeman
Infrastructure
Conception
$500,000 CJ est. value
Bozeman, MT 59718

INDUSTRY at MSU Innovation Campus
New Construction - 87,000 SF
Design
Bozeman, MT 59718

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

2023 Downtown Sewer Renovations
Infrastructure
Bidding
$1,120,000 CJ est. value
Bozeman, MT 59715

Phase 3 Sourdough Fuels Reduction Project
Infrastructure
Bidding
$250,000 CJ est. value
Bozeman, MT 59715

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

West Yellowstone Airport Terminal - Schedule 1 & 1A
Infrastructure
Post-Bid
$14,370,700 CJ est. value
West Yellowstone, MT 59758

Airfield Pavement Rehabilitation, Taxiway a Extension, Taxiway a Lighting
Infrastructure
Results
$5,034,562 CJ est. value
Three Forks, MT 59752

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Bozeman Health Medical Clinic
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Bozeman, MT 59715

Timber Ridge Apartments
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bozeman, MT 59718

Fowler Connection (Huffine to Oak) - SIF114 - City of Bozeman
Infrastructure
Conception
$8,000,000 CJ est. value
Bozeman, MT 59718

Southside Lofts
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Bozeman, MT 59715

RFP D/B - Riverside Lift Station and Force Main
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Bozeman, MT 59715

Last Updated 09/02/2022 01:34 PM
Project Title

Aurora Shell & TI - Phase 1

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59715   (Gallatin County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

*As of September 2, 2022, all trades have been let. The project consists of a 78,000 sf core and shell building with Tenant Improvements. It will be constructed on a 4.8 acre site in the MSU Innovation Campus in Bozeman, Montana. The west portion of the building is a single story building constructed with steel frame and precast concrete exterior walls. The two story eastern side of the building is primarily steel framed with wood construction in the central lobby. Interior Tenant Improvements for Phase I, are part of this package (Western Portion of Building).

Details

78,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents