Similar Projects
Highway Construction - CTH N - STH 59 to County Line - Rock County
Infrastructure
Conception
$8,550,000 CJ est. value
Whitewater, WI 53190

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Delavan, WI

Bloomfield Mckay Park Pavilion and Parking Lot
New Construction, Infrastructure
Results
WI

2022 Joint and Crack Cleaning/Sealing
Infrastructure
Results
Lake Geneva, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Meijer / Delavan
Demolition, Term Contract, New Construction, Infrastructure - 160,000 SF
Pending Verification
$30,000,000 CJ est. value
Delavan, WI 53115

Meijer / Delavan
Demolition, Term Contract, New Construction, Infrastructure - 160,000 SF
Pending Verification
$30,000,000 CJ est. value
Delavan, WI 53115

Multi-Tenant Retail Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Whitewater, WI 53190

Crack Filling Various Town Roads
Infrastructure
Post-Bid
Delavan, WI

Foundry Road Reconstruction
Infrastructure
Results
Darien, WI 53114

Mill Pond Pier Replacement
Infrastructure
Construction
$53,950 CJ est. value
East Troy, WI 53120

Last Updated 05/24/2023 10:23 AM
Project Title

2023 Lake Geneva Street Program

Physical Address View project details and contacts
City, State (County) Lake Geneva, WI 53147   (Walworth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,179,720 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Aggregate, Paving - Concrete, Roadway Pavement Markings, Pavement - Marking, Sidewalks/Curbs/Gutters, Street/Road Asphalt Resurfacing and Milling, Concrete Pavement, Street/Road Asphalt Milling, ADA Curb Ramps, Traffic Control, Curbs, Paving (Trail Paving), Grubbing & Clearing, Concrete Pavement Removal, Paving (Asphalt or Concrete) Description: The work includes furnishing of all materials and equipment and performance of the following work, according to the Plans, Specifications and Contract Documents (PS & CD). The Base Bid work for the above contract includes the following treatments to the respective streets, alleyways, and parking lots: Full Pavement Reconstruction: o Lake Geneva Boat Parking Lot F (at S Lakeshore Dr / Baker St) 3-Inch (Full Depth) Asphalt Mill and Overlay: o North St / St Alleyway (between Cook St / Broad St) o Waverly St Alleyway (between Spring St / Haskins St) o George St / Wheeler St Alleyway (between Elkhorn Rd / Tolman St) 2-Inch Asphalt Mill and Overlay: o Circle Dr (at Miller Rd) o Elm St (between W South St / Maple St) o Henry St (between Williams St / Center St) o Horace St (between Grant St / Wheeler St) o North St (between Warren St / Madison St) o Pond View Ln (at St) o St (between Pond View Ln / McDonald Rd) o Fair View Ln (between Sky Lane Dr / Termini) o Sky Lane Dr (between Fair View Ln / Linda Ln) o Wells St (between Cass St / Campbell St) New Sidewalk will also be constructed on the North side of Baker Street as a part of this project. Also included is the repaving of the Bike Path on the North side of Townline Road from Hudson Trail to Edwards Boulevard. Major work items and approximate quantities include: 3,500 tons HMA Pavement, 7,000 SF of Concrete Sidewalk, 2,500 LF of Concrete Curb & Gutter, 3,400 CY of excavation common / excavation common - EBS, 5,400 TON of Base Aggregate Dense, and 6,000 SY of landscape restoration. These improvements also include clearing & grubbing, driveway replacement, sawing asphalt and concrete, traffic control, pavement markings, and erosion control.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents