Similar Projects
Pedestrian Ramp Reconstruction and Sidewalk
Bidding
Boston, MA

Off-Street Parking in the North End
Infrastructure
Bidding
Boston, MA

Asphalt Paving and Sidewalks
Post-Bid
$60,000 est. value
Medway, MA

Asphalt Sidewalks
Post-Bid
Less than $125,000 est. value
Medway, MA 02053

Sidewalk and ADA Improvements at Various Locations
Results
Less than $416,336 est. value

Sidewalk and ADA Improvements and Related Work (Including Signals) Along Sections of Routes 107, 127 And 129
Results
Less than $1,230,000 est. value

Pointe Place Parking
Pending Verification
Dover, MA

Asphalt Sidewalks at Lovering Height
Post-Bid
Medway, MA 02053

Sidewalk and ADA Improvements at Various Locations
Results
Less than $563,975 est. value

Boardwalk Milford Street
Post-Bid
Less than $150,000 est. value
Medway, MA 02053

Sidewalk and ADA Repairs and Improvements at Various Locations
Results
Less than $714,000 est. value

Repairs to Existing Memorial School ADA Entrance Ramp
Post-Bid
Medway, MA 02053

Sidewalk and ADA Improvements and Related Work at Various Locations
Results
Less than $83,000 est. value

Sidewalks and Curbing Installation and Replacement
Post-Bid
Less than $200,000 est. value
Wellesley, MA 02481

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,914,469 est. value

Reported 05/12/2021 12:00 AM
Project Title

Removing, Disposing of and Installing A Handicap Accessible Structure

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from Agency's Affiliate - 04/12/21
Owner View project details and contacts
Architect View project details and contacts
Description

The Boston Public Health Commission seeks bidders to provide proposals on the work of removing, disposing of and installing a handicap accessible structure. The existing ramp will need to be removed and disposed of. We ask that the contractor install a three-tiered wheelchair lift. This involves cutting the asphalt, pouring concrete footers, ordering the product, ensuring the POE is accessible and if not, wiring for power. Contractor is responsible for all measurements and product calculations.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents