Similar Projects
Nathan Bedford Pier Repair
Term Contract, Infrastructure
Post-Bid
$50,000 est. value
Eva, TN 38333

Composite Decking and Accessories
Infrastructure
Post-Bid
Maryville, TN

Deck replacement
Term Contract, Alteration
Post-Bid
Harrison, TN 37341

Boat Ramp at Old Washington Ferry
Infrastructure
Bidding
Dayton, TN

TWRA Courtesy Dock
Alteration
Post-Bid
$75,000 est. value
Nashville, TN

Construction of a Boat Dock
Results
Soddy-Daisy, TN 37379

Chickamauga Lock Upstream Approach Wall Construction
Post-Bid
$25,000,000 to $100,000,000 est. value
Chattanooga, TN 37415

Last Updated 12/01/2021 09:43 AM
Project Title

Paris Landing Hotel Transient Dock

Physical Address View project details and contacts
City, State (County) Buchanan, TN 38222   (Henry County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing transient dock and will be limited to the dock itself. The gangway will remain and be protected in construction and the stiff arms will remain for reuse. The existing dock will be removed and disposed of off park in a manner that will promote recycling of all materials. Contractor will take caution to protect the stiff arms and the gangway these will stay and be reused to support and access the new dock. The new dock will be eight foot wide and one hundred 44 foot long and will use the same footprint as its predecessor. The existing 26-A permit will be sufficient for the replacement. This project will include new flotation, new galvanized framework, and 8x100 44-foot stamped deck dock. Also included will be a 20-foot section of ADA centered at gangway, 270 foot raised perimeter banding board for wheelchair limits. Side cleats will be mounted on ten-foot centers and four solar lights of four thousand lumens equally spaced on the dock at 14 foot in Height.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents