Similar Projects
Median Crossover Construction - TH 35
Infrastructure
Conception
$500,000 CJ est. value
Annandale, MN 55302

West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

K Built Construction Office Building
New Construction, Infrastructure - 7,680 SF
Design
$1,600,000 CJ est. value
South Haven, MN 55382

School Boulevard Safe Routes to School Project
Infrastructure
Bidding
$300,000 CJ est. value
Monticello, MN 55362

RFP - Redevelopment of Downtown Property at 74 Oak Avenue North
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Annandale, MN 55302

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

2021 Street Improvements Project
Results
Maple Lake, MN

Dague Avenue Northeast and 30th Street Northeast Reconstruction
Term Contract, Infrastructure
Results
Buffalo, MN 55313

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Albertville Self-Storage Facility
New Construction, Infrastructure - 90,185 SF
Pending Verification
$10,000,000 CJ est. value
Albertville, MN 55301

TH 25 to CSAH 14 - Wright County
Infrastructure
Conception
$603,000 CJ est. value
Maple Lake, MN 55358

Build Custom Home
New Construction, Infrastructure
Design
Rockford, MN 55373

Last Updated 01/06/2023 10:32 AM
Project Title

Lift Station

Physical Address View project details and contacts
City, State (County) South Haven, MN 55382   (Wright County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $596,411 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new lift station and sanitary sewer manhole, associated sewer pipe and force main, along with the removal of the existing lift station. Est. Completion Date: Nov. 30, 2023 The Issuing Office for the Bidding Documents is: Bollig Inc, 1700 Technology Drive NE, Suite 124, Willmar, MN 56201. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Goals for minority participation for each trade 2.9% Goals for women participation for each trade 6.9%

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents